Archive for November, 2009

OT Room Air Conditioning Problem III: Control of the RH & Temperature

Categorized Under: Air Conditioning & Ventilation No Commented

OT Room Air Conditioning Problem III: Control of the Temperature & RH
Further to my post Operation Theater Room (OT) air conditioning system problem part II, today I going to talk about the control of the OT room temperature and relative humidity (RH).
Problem
As you know that the air flow (CFM or CMM), temperature and RH parameter [...]

Cameron Highland Trip

Categorized Under: Daily Log No Commented

I travel to Cameron Highland for the past few days (15~18 November) together with my beloved wife. Wowo really a good place for relaxing, the weather and environment is very nice, it make my mind completely relax with it (it is very stress as a M&E services consultant engineer especially when u facing some problem which can’t [...]

Business or Engineering?

Categorized Under: Daily Log No Commented

Business or Engineering?
A lot of people might thought that engineer is a very high paid professional job. However, as a consultant engineer I understand that this so called professional a lot of time is not professional at all, or more correct way to say is the situation not allows you to act professionally. Why say [...]

OT Room Air Conditioning Problem II: RH Increase When Temperature Drop

Categorized Under: Air Conditioning & Ventilation No Commented

OT Room Air Conditioning Problem II: RH Increase When Temperature Drop
Further to my post on the hot air ventilation problem of the Operation Theater Room (OT) air conditioning, there is another problem I facing after resolve the above problem which I going to share with you all in this post. By then, hopefully you will [...]